Samples basket

Asia Pacific

North America

Middle East, North Africa and India

Madeleine House care home

Seamless and disruption-free installation at care home

Altro Stronghold 30 adhesive-free

Birmingham, England, UK - Madeleine House care home in Birmingham, England is a trusted provider of care for elderly people and offers support for people who have residential and dementia care needs. The Madeleine House team pride themselves on the quality of their catering, with their Chef Manager preparing meals daily from fresh, seasonal ingredients. To offer modernized facilities for its residents, staff decided it was time to renovate the care home’s kitchen.

As the care home catering team were operating out of a temporary kitchen in the car park, kitchen renovation needed to be completed quickly and with limited inconvenience and disruption to the staff and residents. After conversations with Altro representatives and recommendations from the installer, Altro Stronghold 30 adhesive-free was specified.

“Using an adhesive-free floor took away the chance of a poor installation and uneven finishes. It was a seamless process with the same product guarantees. Gutted I didn’t know about this product sooner to use on other previous projects.” Rick Bhatti, Property Delivery Surveyor at Anchor Care, said about Altro Stronghold 30 adhesive-free.

Altro Stronghold 30 adhesive-free in color Tempest was installed in the commercial kitchen. Designed exclusively for commercial kitchens, Altro Stronghold 30 adhesive-free can be welded and walked on the same day, significantly reducing kitchen downtime.

Why would you pay more for adhesive, labor and kitchen downtime when you could use adhesive-free which saves on all of these,” Rick Bhatti went on to say.

Altro Stronghold 30 adhesive-free flooring is built to last and engineered to handle tough kitchen environments. It’s a breeze to install, maintain and repair, with exceptional scratch and scuff resistance for enduring performance. Featuring Altro’s highest slip resistance rating and a comfortable 3mm thickness, it also reduces noise by up to 10dB.

The seamless installation of Altro Stronghold 30 adhesive-free flooring at Madeleine House ensured a quick, efficient renovation, allowing the care home’s kitchen to continue serving residents with minimal disruption.

Download the Madeleine House care home PDF

Published 24/03/2025

Testimonials

“Using an adhesive-free floor took away the chance of a poor installation and uneven finishes. It was a seamless process with the same product guarantees. Gutted I didn’t know about this product sooner to use on other previous projects.”

“Why would you pay more for adhesive, labor and kitchen downtime when you could use adhesive-free which saves on all of these”